Home
>News>News
Protect eyesight:
Hami Gas Turbine 9E EPC Project Undertaken by CEEC AEPC Commences
Date:2020-05-25 VisitCount: Font size:[ L M S ]
 


       The first concrete pouring for Hami Gas Turbine 9E Project, which is undertaken by China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd on EPC basis, is conducted at 10:58, May 18, 2020, which symbolizes formal commencement of the project.
  The project, located at Naomaohu Town, Yiwu County, Hami City, Xinjiang Autonomous Region, for which we initially built two 9E-class gas-turbine combined recycle generation units to generate electricity by Ramsbottom carbon residue exhausts in the world. We’ve undertaken the new building and modification works, including one 200 ton/h gas boiler, and modification of existing gas boiler to make full use of tail gas from coal chemical factory within the Industry Park and to improve comprehensive utilization rate of resources.

Before the commencement, we plan and organize resources carefully and scientifically to booster the construction of temporary facilities, and finally we have realized the commencement with high standards. We fully exert integral management advantages of ‘Engineering, Procurement and Construction’, take Engineering as the lead to improve work efficiency, and build a Safety-Quality-Environment control system with ‘comprehensive direction, multiply levels and full covering’ to standardize construction and make the excellent quality project, in order to endeavor target of COD within the year.
(Author: Yan Guobiao; Translator: Zhang Qingfu)

print】【close
Prev:
Next:

Produced By 大汉网络 大汉版通发布系统