OVERSEAS PROJECTS EXECUTED
Date:2017-09-01 VisitCount: Font size:[ L M S ]

1. Sasan 6×660MW Ultra Mega Power Plant Project, India

       This project is located in Madhya Pradesh, India. and SEC works as a general contractor. We have been responsible for supply of installation materials, technical guidance and erection of turbine proper within BTG scope. This project was commenced in August 2010, and delivered in March 2015, which was completed 6 months in advance and a new record was set in India.
      

       2.  Haldia 2×300MW Coal-fired Power Plant Project, India

       The project is located in West Bengal, India. The general contractor is SEC. We have been responsible for supply of installation materials and technical guidance of BTG scope. This project was commenced in July 2012 and handed over in March 2015. Our excellent performance won us praises of the owner.

 

       

 

     3.  Izmir 1×350MW Coal-fired Power Plant Project  
    
The general contractor is CMEC and we have been in charge in supervision services. Located in Izmir, Turkey, this project was commenced in October 2012 and handed over in April 2015. It synchronized and was put into operation two month in advance, which set a new record in electric power construction in Turkey.

      

 

4.  Takalar 2×100MW Coal-fired Steam Power Plant Project, Indonesia

     Takalar 2×100MW Coal-fired Power Plant EPC Project is located in Jeneponto, South Sulawesi, Indonesia, the owner of which is PLN. The EPC general contractor is CGGC, and we are responsible for execution of the project.